We use cookies, including third-party cookies from Google to serve personalized ads through AdSense, to operate this site and understand how it is used. By continuing to browse, you accept this use. See our Privacy Policy and Terms of Use for details, including how to opt out of personalized advertising.
Accept
SmartData CollectiveSmartData Collective
  • Analytics
    AnalyticsShow More
    What Kind of Problem-Solving Distinguishes Data Analysts From Software Engineers -- AI-generated illustration
    What Kind of Problem-Solving Distinguishes Data Analysts From Software Engineers
    7 Min Read
    chatgpt image jul 21, 2026, 04 34 30 pm
    4 Core Benefits of Predictive Maintenance after Vibration Analysis
    10 Min Read
    How Does Data Mining Boost Customer Satisfaction in Logistics? Harnessing Analytics for Results -- AI-generated illustration
    How Does Data Mining Boost Customer Satisfaction in Logistics? Harnessing Analytics for Results
    11 Min Read
    chatgpt image jul 13, 2026, 04 23 45 pm
    How Data Analytics Helps Companies Improve User Engagement
    19 Min Read
    chatgpt image jul 13, 2026, 03 59 46 pm
    How Data Analytics Improves Multi-Location Search Strategies
    10 Min Read
  • Big Data
  • BI
  • Exclusive
  • IT
  • Marketing
  • Software
Search
© 2008-25 SmartData Collective. All Rights Reserved.
Reading: Key Benefits of Leasing vs. Building a Data Center
Share
Notification
Font ResizerAa
SmartData CollectiveSmartData Collective
Font ResizerAa
Search
  • About
  • Help
  • Privacy
Follow US
© 2008-23 SmartData Collective. All Rights Reserved.
SmartData Collective > Big Data > Data Warehousing > Key Benefits of Leasing vs. Building a Data Center
Data Warehousing

Key Benefits of Leasing vs. Building a Data Center

onlinetech
onlinetech
5 Min Read
Key Benefits of Leasing vs. Building a Data Center
Photo by NomeVisualizzato on Pixabay (https://pixabay.com/photos/strawberry-sepal-berry-berries-4992689/)
SHARE

So your company is expanding and growing at a rapid rate, and the demand requires more space, power and cooling – what do you do? Build a new data center, or buy (lease, or outsource your IT needs to a different provider).

Research firm Forrester conducted interviews of IT professionals to analyze the economics of data centers and the classic build vs. buy conundrum that arises when it comes time to provision for additional capacity, IT infrastructure and operations.

Online Tech’s New Ann Arbor Michigan Data Center

Leasing a Data Center (Colocation)
What kind of advantages are associated with colocation that you don’t get with building a data center? Forrester reports that there are very few upfront costs, and most of the expenditure is operational, not capital.

  • More predictable expenditure model with costs that increase consistently over the life of the data center
  • Flexible – additional capacity can be scaled up as needed, no wasted extra capacity or build outs needed
  • More accessible to space and power through a provider’s purchasing power
  • Experienced and certified professionals lend their expertise of running a data center with high efficiency and high availability.

Building a Data Center
What kind of advantages are associated with building your own data center that you can’t get when you choose colocation? Mainly control:

More Read

Handling The Big Data Faucet
Handling The Big Data Faucet
Business Intelligence Maturity Assessment: Data Visualization and Data Strategy Services
Digital data explosion highlights need for new-age Database and Business Intelligence technologies
Not Seeing the Results of Big Data? Maybe You Have a Lot of Data, Not Big Data
BI and a different type of outsourcing
  • Complete control over an operating environment, including access, temperature, etc.
  • Low risk of losing your lease
  • Ability to leverage and share existing space

What kind of upfront costs are associated with building your own data center?
The detailed and practical costs of building your own data center include a fair amount of capital and upfront costs. But there are other often overlooked costs that add up quickly:

  • Upfront planning, design and commissioning – ranging from 20-25 percent of total upfront construction cost.
  • Base building shell and property – only applicable if you’re not starting with an existing building. According to the Forrester report, the estimated cost of building the data center shell plus physical security $200 per square foot.
  • Fire suppression and detection – ranging from $20-60,000 to purchase agents, equipment and to install systems – including early smoke detection systems, FM-200, inert gas blends, etc.
  • Building permits and local taxes – while these costs vary from region to region, a moderate national estimate is $70 per square foot in building permits and taxes.
  • Data center infrastructure – includes purchasing and installing mechanical equipment and electrical equipment, ranging from $7-20,000 per kW of IT load.
  • Network connection cost – you’ll have to pay for fiber on-site, which could run you $10,000 per mile, varying by many other factors.
  • Power – this expense accounts for 70-80 percent of the total costs of running a data center, and is also highly variable by region.
  • Data center staffing – around-the-clock monitoring, on-site maintenance and equipment optimization requires a dedicated and responsive operations staff, and accounts as the second largest expense after power.
  • Annual facility and infrastructure maintenance – a more unpredictable cost of a data center ranging from 3-5 percent of the initial construction cost. Repairs and additions are expected around the third year of operation.

Find out more about Online Tech’s newest Michigan data center, offering Michigan colocation and other IT services.

Source:
Build or Buy? The Economics of Data Center Facilities

TAGGED:data centers
Share This Article
Facebook Pinterest LinkedIn
Share

Follow us on Facebook

Latest News

Technical architecture diagram and decision framework for ai-powered logo generation: design.com vs looka
AI-Powered Logo Generation: Design.com vs Looka
Artificial Intelligence Exclusive
Retailers Should Stop Treating Every Stockout as Equal -- AI-generated illustration
Retailers Should Stop Treating Every Stockout as Equal
Business Intelligence Exclusive
Best Vibe Coding Cleanup Specialists in the USA: Fix or Rebuild? -- AI-generated illustration
Best Vibe Coding Cleanup Specialists in the USA: Fix or Rebuild?
Development Exclusive
Using Warehouse, Transportation and Order Data to Plan Distribution-Center Capacity -- AI-generated illustration
Using Warehouse, Transportation and Order Data to Plan Distribution-Center Capacity
Big Data Exclusive

Stay Connected

1.2KFollowersLike
33.7KFollowersFollow
222FollowersPin

You Might also Like

What Michigan Data Centers Can Learn From the Colorado Floods
Uncategorized

What Michigan Data Centers Can Learn From the Colorado Floods

4 Min Read
IBM & SoftLayer One-Year Later: Leader in Data Centers, Cloud and Big Data
Data Management

IBM & SoftLayer One-Year Later: Leader in Data Centers, Cloud and Big Data

4 Min Read
Doctor's Orders: Ex-Pfizer Plant to Become $650 Million Data Center
Uncategorized

Doctor’s Orders: Ex-Pfizer Plant to Become $650 Million Data Center

3 Min Read
New Underground Data Center Trend Takes Hold
Uncategorized

New Underground Data Center Trend Takes Hold

6 Min Read

SmartData Collective is one of the largest & trusted community covering technical content about Big Data, BI, Cloud, Analytics, Artificial Intelligence, IoT & more.

AI chatbots
AI Chatbots Can Help Retailers Convert Live Broadcast Viewers into Sales!
Chatbots
From Bolts to Bots: How AI Is Fortifying the Automotive Industry
From Bolts to Bots: How AI Is Fortifying the Automotive Industry
Artificial Intelligence

Quick Link

  • About
  • Contact
  • Privacy
Follow US
© 2008-26 SmartData Collective. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?